Load schedule
Connected and demand loads with user-defined demand and coincidence factors. Values are not from NEC demand tables. Line-to-neutral vs line-to-line voltage must match how you enter current.
For a 120/240 V split-phase branch, select 1φ and enter the voltage across that two-wire load (120 V or 240 V). A true 240 V three-phase load uses 3φ. Presets are examples, not code requirements.
| Name | Category | Qty | kW/unit | Demand | PF | V | Phase | Panel |
|---|---|---|---|---|---|---|---|---|
Connected: 0.00 kW · Demand: 0.00 kW · Approx. current: 0.0 A
Demand kVA: 0.00 · PF: 0.000