All calculators
Choose a calculator by the quantity you need. Each tool explains its inputs, worked example, and limits. These engineering estimates do not establish code compliance.
Estimates single-phase line current from real power, voltage, power factor, and optional efficiency. Use for branch load checks and nameplate comparisons—not NEC ampacity selection.
Calculates balanced three-phase line current from kW, line-to-line voltage, power factor, and efficiency.
Estimate real electrical power in kW from line current, load voltage and power factor for a two-wire single-phase or balanced three-phase circuit.
Convert a known kW, kVA or horsepower quantity using the supplied power factor and the shared rounded 746 W per mechanical HP convention.
Computes power factor from kW and kVA or related inputs per the form layout.
Constructs kW–kvar–kVA relationships and phase angle for visualization and field checks.
Estimates kvar and approximate current change to reach a target power factor.
Relates synchronous speed, measured rpm, and slip for induction machines.
Estimate acceleration time from rest using total referred inertia, target rpm and constant average net accelerating torque.
Relates transformer kVA rating, load kW/kVA, and load percent for loading assessments.
Calculates three-phase rated line currents on primary and secondary sides from nameplate kVA and line-to-line voltages: I = S / (√3 × V). Results support cable sizing discussions, metering CT planning, and procurement checks—they are not short-circuit duty, tap-compensated protection, or substation relay settings.
Estimates no-load and load losses and efficiency from nameplate loss data and loading.
Analyzes series RLC (and RL, RC, LC subsets) circuits at a sinusoidal frequency: reactances XL and XC, net X, magnitude |Z|, phase angle, power factor, current, and optional resonance. Built for troubleshooting power-factor anomalies, studying detuning, and validating instrument math—not for substation protection studies.
Converts between primary amps and secondary amps for instrument CT ratios.
Calculate an ideal PT/VT voltage ratio from rated primary and secondary voltages.
Calculate total rectangular busbar metal area, current density and an optional user-supplied current-density comparison.
Compute connected lighting input watts per square meter, with an optional arithmetic comparison to previous wattage and operating hours.
Compares measured versus baseline values with tolerance bands for field verification.
Summarize operating-time ratio, starts per hour and average on/off durations from an observation interval.
Summarize a pasted numeric series with mean, minimum, maximum, range, sample standard deviation and first-to-last percentage change.
Compares before and after energy or demand scenarios for retrofit sketches.
Compare one equipment block’s average real power with its rated real power, and its runtime with an observation interval.
Divide electricity use in kWh by a positive user-defined activity denominator, such as floor area, production units or occupancy.
Estimate balanced three-phase motor current from shaft power, line-to-line voltage, running power factor and efficiency. Mechanical hp converts to watts before the shared current engine runs.
Compare a measured real-power load with the applicable generator nameplate kW rating. Choose the correct prime or standby rating before entering the value.
Multiply a manufacturer fuel rate at the actual operating load by operating hours. Select US gallons per hour or liters per hour.
Compare two electricity-meter periods on a common 30-day basis. Energy units can change without changing the physical amount.
Compare electricity use for equivalent reporting periods in consecutive years. Enter the same scope and measurement basis for both periods.
Estimate energy and demand charge components using rates you enter. No Korean tariff or US utility rate table is applied.
Track operating-hour milestones using a manufacturer specified maintenance interval and a known counter origin.
Ohm’s law and DC power for a passive resistive element: solve for V, I, R, or P from any two independent positives.
Convert between AWG, kcmil, circular mil, and mm² using nominal cross-section definitions used for communication — not ampacity.
Convert a stated electrical demand into current at 480 V three-phase or 120 V single-phase. Not a utility service classification or NEC Article 220 load study.
Multiply a user-supplied table ampacity and correction factors, then compare with your design current. The site does not ship NEC Table 310.16.
Physical raceway fill using insulated conductor cross-sectional areas you supply. No NEC Chapter 9 table is embedded.