Service Load Current Estimate
Implementation: TYPE1 ENGINEERING
Convert a stated electrical demand into current at 480 V three-phase or 120 V single-phase. Not a utility service classification or NEC Article 220 load study.
Overview
Convert a stated electrical demand into current at 480 V three-phase or 120 V single-phase. Not a utility service classification or NEC Article 220 load study.
How to Use
Enter values from your one-line diagram, nameplate or code tables you already verified. Calculate, then compare with manufacturer or engineering documents.
Formula
I₃ = P/(√3 V_L PF η); I₁ = P/(V PF η)
Worked Example
Electrical demand (real power): 250 kW; Line-to-line or line-to-neutral voltage: 480 V; Power factor: 0.9 fraction; Conversion efficiency (use 1 for true load): 1 fraction. Primary result (current) ≈ 334.1147 A.
Applicable Conditions
Compare a planned load block with transformer or conductor nameplate data.
Code and Jurisdiction Notes
No NEC edition applied. For optional service templates only with AHJ and utility confirmation.
Limitations
Does not apply demand factors, continuous load rules, or feeder sizing. Verify voltage basis (LL vs L-N).
FAQ
Is this NEC compliant?
No. This is an engineering or user-documented check only. Your AHJ and adopted code edition govern compliance.
Where do code tables come from?
User-supplied tools require values from your NEC adopted edition, manufacturer data, or utility. This site does not embed NFPA tables.
What are the limitations?
Does not apply demand factors, continuous load rules, or feeder sizing. Verify voltage basis (LL vs L-N).