Lighting
Lighting power density
Compute connected lighting input watts per square meter, with an optional arithmetic comparison to previous wattage and operating hours.
Calculator overview
Compute connected lighting input watts per square meter, with an optional arithmetic comparison to previous wattage and operating hours.
How to use
- Enter total installed input power in watts.
- Enter the corresponding floor area in m².
- Read W/m². If comparing an earlier lighting system, supply its watts and the operating-hour assumptions.
Formula
LPD = P / A
- P (W) — Real power
Worked example
Worked example: lighting density
Inputs: watts = 12000, area = 1000. LPD = P/A. Expected lpd = 12 W/m². Display precision may round this value.
Expect key result lpd to contain 12 when you run the calculator with the same inputs.
Understanding the results
W/m² is connected power divided by area. The form does not provide W/ft² input/output switching or automatic energy-code allowances.
Practical applications
Energy code preliminary checks, ECM documentation.
Common mistakes
Omitting exterior or uncooled spaces against the wrong area base.
Limitations
Program-specific allowances are not embedded.
Results are engineering estimates only. They are not NEC compliance, arc-flash studies, or licensed design deliverables.
References
- Guide for the Use of the International System of Units (SI), Appendix B.8(verified)
International length, mechanical horsepower and customary area factors; SI conversion basis. Conversion factors only; legacy source ID is retained and does not denote a 2024 edition. Use separate temperature-interval and absolute-temperature formulas.
- University Physics Volume 2, 9.5 Electrical Energy and Power(verified)
P=IV; resistor dissipation; energy as power integrated over time. DC/resistive and ideal energy accounting; efficiency and capacity factors are user assumptions, not battery discharge curves.
- Explicit mathematical definitions used by Ampory(pending)
Ratios, sums, differences, area fractions and user-defined scheduling arithmetic. Pure arithmetic is independently checked; this is not external technical or regulatory approval.
FAQ
- LED controls savings?
- This is connected load; model controls separately.
- Gross vs net area?
- Match the denominator to your energy model definition.
- Peak demand?
- Use equipment-load or utility meters for demand kW.