Skip to content
AMPORYUnited States

Calculators

Equipment load factor

Compare one equipment block’s average real power with its rated real power, and its runtime with an observation interval.

Review inputs, units, and applicable electrical practice — not a code compliance check.

Enter values and press Calculate to see results here.

Calculator overview

Compare one equipment block’s average real power with its rated real power, and its runtime with an observation interval.

How to use

  1. Enter rated and average power in kW for the same equipment block.
  2. Optionally enter runtime and observation-period hours.
  3. Read average/rated load percentage and runtime/period utilization percentage.

Formula

Load factor = P_avg/P_rated; duty = t_run/t_period

  • Pavg (kW) — See the Formula section and worked example for calculation steps.

Worked example

Worked example: equipment load

Inputs: ratedKw = 150, avgKw = 105, runHours = 12, periodHours = 24. Load ratio = Paverage/Prated × 100; runtime = trun/tperiod. Expected lf = 70 %. Display precision may round this value.

Expect key result lf to contain 70 when you run the calculator with the same inputs.

Understanding the results

This is a ratio calculator for one equipment block. It does not create a multi-equipment load schedule, apply diversity factors or aggregate facility demand.

Practical applications

Plant expansions, spare transformer checks.

Common mistakes

Summing nameplate without duty cycle or diversity.

Limitations

Ratings, average measurement intervals and runtime definitions must match. A load percentage alone does not diagnose equipment condition.

Results are engineering estimates only. They are not NEC compliance, arc-flash studies, or licensed design deliverables.

References

FAQ

Nameplate HP?
Convert via kW-HP tool before aggregating if needed.
Power factor mix?
Separate kW and kVA if the form supports both.
Future loads?
Model growth outside this snapshot or duplicate scenarios.