Calculators
Equipment load factor
Compare one equipment block’s average real power with its rated real power, and its runtime with an observation interval.
Calculator overview
Compare one equipment block’s average real power with its rated real power, and its runtime with an observation interval.
How to use
- Enter rated and average power in kW for the same equipment block.
- Optionally enter runtime and observation-period hours.
- Read average/rated load percentage and runtime/period utilization percentage.
Formula
Load factor = P_avg/P_rated; duty = t_run/t_period
- Pavg (kW) — See the Formula section and worked example for calculation steps.
Worked example
Worked example: equipment load
Inputs: ratedKw = 150, avgKw = 105, runHours = 12, periodHours = 24. Load ratio = Paverage/Prated × 100; runtime = trun/tperiod. Expected lf = 70 %. Display precision may round this value.
Expect key result lf to contain 70 when you run the calculator with the same inputs.
Understanding the results
This is a ratio calculator for one equipment block. It does not create a multi-equipment load schedule, apply diversity factors or aggregate facility demand.
Practical applications
Plant expansions, spare transformer checks.
Common mistakes
Summing nameplate without duty cycle or diversity.
Limitations
Ratings, average measurement intervals and runtime definitions must match. A load percentage alone does not diagnose equipment condition.
Results are engineering estimates only. They are not NEC compliance, arc-flash studies, or licensed design deliverables.
References
- Guide for the Use of the International System of Units (SI), Appendix B.8(verified)
International length, mechanical horsepower and customary area factors; SI conversion basis. Conversion factors only; legacy source ID is retained and does not denote a 2024 edition. Use separate temperature-interval and absolute-temperature formulas.
- University Physics Volume 2, 9.5 Electrical Energy and Power(verified)
P=IV; resistor dissipation; energy as power integrated over time. DC/resistive and ideal energy accounting; efficiency and capacity factors are user assumptions, not battery discharge curves.
- Explicit mathematical definitions used by Ampory(pending)
Ratios, sums, differences, area fractions and user-defined scheduling arithmetic. Pure arithmetic is independently checked; this is not external technical or regulatory approval.
FAQ
- Nameplate HP?
- Convert via kW-HP tool before aggregating if needed.
- Power factor mix?
- Separate kW and kVA if the form supports both.
- Future loads?
- Model growth outside this snapshot or duplicate scenarios.