Calculators
Baseline versus proposed energy
Compares before and after energy or demand scenarios for retrofit sketches.
Calculator overview
Compares before and after energy or demand scenarios for retrofit sketches.
How to use
- Enter baseline and proposed average kW.
- Enter baseline and proposed annual operating hours.
- Optionally supply energy rates and capital cost.
- Read power and annual-energy differences, with simple payback only when savings and capital inputs define it.
Formula
ΔE = P₀×t₀ − P₁×t₁; simple payback = investment / annual savings
- P0,P1 (kW) — See the Formula section and worked example for calculation steps.
Worked example
Worked example: retrofit compare
Inputs: baselineKw = 300, proposedKw = 237.5, baselineHours = 4000, proposedHours = 4000. ΔE = Pbaseline tbaseline − Pproposed tproposed. Expected de = 250000 kWh. Display precision may round this value.
Expect key result de to contain 250000 when you run the calculator with the same inputs.
Understanding the results
Annual energy is each average kW multiplied by its own operating hours. A reduced kW value does not ensure energy savings if the proposed equipment runs longer.
Practical applications
LED or VFD projects, management approval packets.
Common mistakes
Ignoring interactive effects between ECMs.
Limitations
No utility incentive program rules.
Results are engineering estimates only. They are not NEC compliance, arc-flash studies, or licensed design deliverables.
References
- Guide for the Use of the International System of Units (SI), Appendix B.8(verified)
International length, mechanical horsepower and customary area factors; SI conversion basis. Conversion factors only; legacy source ID is retained and does not denote a 2024 edition. Use separate temperature-interval and absolute-temperature formulas.
- University Physics Volume 2, 9.5 Electrical Energy and Power(verified)
P=IV; resistor dissipation; energy as power integrated over time. DC/resistive and ideal energy accounting; efficiency and capacity factors are user assumptions, not battery discharge curves.
- Explicit mathematical definitions used by Ampory(pending)
Ratios, sums, differences, area fractions and user-defined scheduling arithmetic. Pure arithmetic is independently checked; this is not external technical or regulatory approval.
FAQ
- Simple payback?
- Add cost inputs externally if not in the form.
- Demand charges?
- Enter kW deltas if the mode supports demand.
- Baselines drifting?
- Re-baseline when occupancy or production changes.